|
Milngavie Project.
This is allocated in Milngavie CE Centre.
We are situated in the two large rooms downstairs
craft 1 & 2 we additionally use the facilities within the centre, the library and
games hall. We have two designated areas to meet
your child within Milngavie Primary school, depending on their class.
Our staff then escort children to the CE Centre.
The Milngavie project was
inspected on 26 August and achieved a Grade 5. You
can download the Inspection Report
here.
Milngavie Breakfast Club
The Breakfast Club opened on 16
August 2010 at Milngavie Primary School. Children
can enjoy a balanced healthy breakfast and fun
activities then be escorted to school by our staff,
the contact phone number is
07551 314483.
Castlehill Project
Our play setting is within the school
Dining Hall which is a wonderful space for play and activities. We also are able to use the
games hall for traditional games and fitness and use the school playground for football, skipping, parachute games etc. This project is for St Andrews and Castlehill pupils. We have 60 spaces daily and 24 at our breakfast club. The breakfast club is open from 8am and we escort your child to school in time for the bell.
Castlehill achieved Grade 5 in its last inspection
(June 2010). You can download the
Inspection Report
here.
St Joseph’s Project
St Joseph's base is in the hut behind the main school.
For After School we collect from Craigdhu and St Joseph's Primary Schools. This base also has a
Breakfast Club that drops off at Craigdhu and St Joseph's. There
are 50 after school and 30 breakfast club places. We are able to use the playground daily and have lots of opportunities for active play
St Joseph’s achieved Grade 5 at their last inspection in December 2009.
You can download the Inspection
Report
here.
Clober Project
Our Clober base opened in
August 2009 and is situated in the Dining Hall of
Clober Primary School. We have 24 breakfast club and
afterschool places. We have daily use of the gym and the playground. Clober also offers Breakfast Club facilities.
In June 2010 Clober had its
first
inspection and was awarded
Grade 5. You can download the
Inspection Report
here.
|